Team Experience Highlights: Key Projects from Our Professionals' Careers

The professionals at Sensetrone bring with them a wealth of hands-on experience from roles in leading national and international companies. Before joining our consultancy, our engineers, project managers, and quantity surveyors successfully contributed to the delivery of complex, high-value projects across various sectors.

This collective background forms the bedrock of our expertise, allowing us to understand client needs from multiple perspectives—whether as a main contractor, subcontractor, or consultant.

We don't just bring theoretical knowledge; we bring a history of real projects, real challenges, and real results.

Riyadh North Phase 6 – Infrastructure and Streetscape

Key Stakeholders Managed: Client (Abu Dhabi Municipality), Contractors, Subcontractors, Site Teams, Suppliers

Scope: Roads, drainage, landscaping, street lighting, and utilities

Duration: April 2022 – December 2025

Our Role: Contract Administration, Change Management, Payment Certification, Budget Tracking and Forecasting, Risk and Delay Management

PM Tools & Methodologies Used: FIDIC 1999, Primavera P6 / MS Project, Power BI Dashboards, Aconex (Document Control)

PM Challenges Overcome: Concurrent delays, multi-disciplinary coordination, strict municipal compliance

  • On-time interim certifications
  • Controlled variation orders
  • Real-time budget visibility
  • Minimized disputes

Nareel Island Development – Marine and Reclamation

Key Stakeholders Managed: KEO International Consultants, Marine Contractors, Environmental Agencies, Client Representatives, Survey Teams

Scope: Dredging, reclamation, rock revetments, quay walls, beach works

Duration: Feb 2010 – April 2022

Our Role: Hydrographic survey analysis, volume verification, commercial management

PM Tools & Methodologies Used: QINSY / Multibeam Survey Tools, CESMM4 Measurement, Delay Analysis Techniques

PM Challenges Overcome: Complex marine logistics, environmental compliance, concurrent delay claims

  • Accurate dredging volume certification
  • Successful handover of quay walls & beaches
  • Dispute minimization

City Project 7089 – High-Security Infrastructure

Key Stakeholders Managed: UAE Ministry of Defence, Security Consultants, Technology Vendors, Government Auditors

Scope: Security system implementation across Abu Dhabi

Duration: Feb 2010 – April 2022

Our Role: Tender evaluation, BOQ preparation, variation management, Confidential Reporting

PM Tools & Methodologies Used: Secure Document Management Systems, Risk Registers, Classified Communication Protocols

PM Challenges Overcome: High confidentiality, strict change control, defense-standard compliance

  • Successful secure system rollout
  • Zero breach incidents
  • Full contractual and budget adherence

Al Riffa & Turrfana Roads and Drainage

Key Stakeholders Managed: Jacobs Halcrow International Partnerships, Municipal Authorities, Contractors, Utility Providers, Community Representatives

Scope: Complete road and drainage networks for residential sectors

Duration: July 2007 – Feb 2010

Our Role: BOQ preparation, payment certification, variation approval

PM Tools & Methodologies Used: AutoCAD Civil 3D (Take-offs), MS Excel (Cost Models), Stakeholder Engagement Plans

PM Challenges Overcome: Multiple stakeholder interests, municipal approval delays, design revisions

  • Completed road and drainage networks
  • Timely payment cycles
  • Enhanced urban flood resilience

Mobitel Telecom Network Deployment – Eastern Region

Key Stakeholders Managed: Mobitel (Client), Subcontractors, Local Authorities, Utility Providers, Equipment Vendors

Scope: Complete turnkey deployment of mobile network infrastructure across the Eastern Province

Duration: April 2007 – December 2011

Our Role: End-to-End Turnkey Project Management, Site Survey & TSSR Preparation, Material & Equipment Logistics, Installation, Configuration & Commissioning Oversight, Progress Tracking & Handover Management

PM Tools & Methodologies Used: MS Project / Primavera P6, Site Survey Tools & GIS, Inventory & Logistics Trackers, Commissioning Checklists

PM Challenges Overcome: Remote terrain access in Eastern Province, Coordinating multi-vendor equipment delivery, Timeline pressure for network launch

  • Fully operational mobile network deployed
  • On-time site commissioning and handover
  • Seamless integration with national telecom grid

Airtel, Dialog East Region Network Rollout & Expansion

Key Stakeholders Managed: Airtel, Dialog, Huawei PMO, Field Teams, Regulatory Bodies

Scope: End-to-end network deployment, expansion, and ongoing maintenance across Eastern Sri Lanka, including PM oversight of rollout, upgrades, and operational support.

Duration: 2014 – 2017

Our Role: Full Project Lifecycle Management, Network Expansion Planning & Execution, Maintenance & Support Coordination, Subcontractor & Resource Management, Reporting & Compliance Assurance

PM Tools & Methodologies Used: ERP-PM & WBS Tools, i-Site for Cost & Material Analysis, Risk & Issue Registers, Daily/Weekly Dashboards

PM Challenges Overcome: Rapid scaling during network expansion phases, Maintaining uptime during rollout, Managing multi-operator requirements

  • Successful expansion of 4G/3G coverage in Eastern Sri Lanka
  • Enhanced network capacity and reliability
  • Sustained operational support post-deployment

Ooredoo – Maldives RAN Modernization Project

Key Stakeholders Managed: Ooredoo Maldives, Contractors, Vendors, Transmission Teams

Scope: Radio Access Network modernization across multiple atolls in the Maldives, including project control, contractor management, reporting, and transmission support.

Duration: 2011 – 2015

Our Role: Project Progress Control & Contractor Management, WBS & ERP-PM Scheduling, Daily/Weekly Reporting (Progress, Risks, AWR, PO Tracking), Technical Support for Microwave & Fiber Transmission, PM-Directed Task Execution

PM Tools & Methodologies Used: WBS & ERP-PM Systems, i-Site Configuration & Reporting, Risk Register & AWR Trackers, Transmission Test Tools

PM Challenges Overcome: Island geography and logistics complexity, Coordinating international contractors, Ensuring minimal service disruption during modernization

  • Modernized RAN infrastructure across multiple atolls
  • Improved network performance and capacity
  • On-time, within-budget project completion

Delta Trukiy Co. – KSA South Region O&M Project

Key Stakeholders Managed: Mobily (Client), Field Teams, Vendors, Regional Management

Scope: 24/7 operations and maintenance of 1600+ telecom sites in Southern KSA, including MW/fiber links, BTS systems, and preventive/corrective maintenance.

Duration: 2013 – 2015

Our Role: Team Leadership for 24/7 Network Operations, Technical Support for MW, Fiber, BTS (2G/3G/WiMaX), O&M Material Management, Preventive & Corrective Maintenance Planning, Site SWAP & Upgrade Coordination

PM Tools & Methodologies Used: Network Monitoring Systems, Inventory Management Tools, Maintenance Scheduling Software, Incident Reporting Platforms

PM Challenges Overcome: Maintaining 1600+ sites with 24/7 uptime, Remote desert site accessibility, Rapid response for critical outages

  • Sustained network availability above 99.5%
  • Efficient material and team resource utilization
  • Enhanced network stability in South KSA region

Our Directly Executed Local Construction Projects

The following projects are key projects that were directly executed and managed by our organization as the main contractor or turnkey service provider. From initial concept and design through to construction, compliance, and final handover, we have taken full responsibility for delivering quality, timely, and sustainable built solutions across Sri Lanka.

Construction of Villas - Arugambay

Key Stakeholders Managed: Mr. AL Latheef (Private Villa Owner), Tourism Authority, Local Municipal Council, Contractors, Interior Designers

Scope: Design and construction of Villas in Arugambay

Duration: 12 Months (Proposed)

Our Role: End-to-End Turnkey Project Management, Design Coordination & Tourism Compliance, Contractor & Supplier Procurement, Budget & Cash Flow Management, Quality, Safety & Timeline Oversight, Handover & Operational Readiness

PM Tools & Methodologies Used: Primavera P6 / MS Project, AutoCAD / BIM for Design Coordination, Risk Register & Stakeholder Matrix, Progress Dashboards & Reporting Tools

PM Challenges Overcome: Coastal regulatory & environmental compliance, Seasonal weather impacts on construction timeline, Sourcing premium finishes within budget, Managing multiple villa units concurrently

  • Fully furnished & operational luxury villas
  • Compliance with tourism & coastal construction codes
  • On-time delivery ahead of tourist season
  • High-quality finishes ensuring guest satisfaction & ROI

Design & Construction of Two-Storied Hotel Building – Arugambay

Key Stakeholders Managed: Hotel Owner, Architect, Engineers, Contractors, Local Municipal Council, Tourism Authorities

Scope: Two-story building for tourism

Duration: 6 Months (Proposed)

Our Role: End-to-End Turnkey Project Management, Architectural & Structural Design Coordination with Tourism Compliance, Contractor & Supplier Procurement, Budget & Cash Flow Management, Quality, Safety & Timeline Oversight, Handover & Operational Readiness

PM Tools & Methodologies Used: Primavera P6 / MS Project, AutoCAD / BIM for Design Coordination, Risk Register & Stakeholder Matrix, Progress Dashboards & Reporting Tools

PM Challenges Overcome: Fast-track design-to-build timeline, Tourism-season-driven deadline, Remote location logistics, Balancing cost-efficiency with premium guest experience

  • Fully operational hotel ready for opening
  • Design aligned with tourism market expectations
  • Timely delivery ahead of peak season
  • Compliance with hospitality safety & zoning regulations

Aththimunai Mosque Construction

Key Stakeholders Managed: Local Community, DS Office, Cultural Ministry, Contractors

Scope: Complete mosque construction with utilities and facilities

Duration: March 2024 – March 2025

Our Role: MS Project / Gantt Charts, Stakeholder Registers, Site Progress Dashboards

PM Tools & Methodologies Used: Primavera P6 / MS Project, AutoCAD / BIM for Design Coordination, Risk Register & Stakeholder Matrix, Progress Dashboards & Reporting Tools

PM Challenges Overcome: Remote site with no utilities, Complex regulatory approvals, Limited community resources

  • Fully operational mosque for 714+ residents
  • All utilities installed (water, electricity)
  • 5-year maintenance plan implemented

Project Management for Community & SME Development

These initiatives highlight our role as project managers, facilitators, and strategic partners in community-led and SME development efforts. Rather than direct construction, our focus here is on capacity building, resource linkage, and sustainable growth, applying structured project management to foster resilience, create livelihoods, and strengthen local economies.

Supertour Arugam Bay (Business Development)

Sector: Tourism & Hospitality

Services Provided: Business Strategy & Structuring, Service Portfolio Development, Financial Planning & Growth Modeling, Partnership & Network Building

Approach & Methodology: Market Analysis & Positioning, Revenue Stream Diversification, Digital Marketing & Customer Experience Design

Key Stakeholders: Tourism Authorities, Local Hotels, Guesthouses, Community Organizations

Duration: 2021 – Ongoing

Key Challenges: Post-COVID tourism recovery, High competition in a seasonal market, Need for differentiated offerings

  • Revenue growth from $3.6K to $16.5K projected (2025)
  • 4.8/5 online rating
  • Created 12+ local jobs
  • Laid groundwork for eco-lodge expansion

Chicken Feed Manufacturing (SME Support)

Sector: Agriculture & SME Development

Services Provided: Skill Development & Training, Supply Chain & Resource Facilitation, Market Linkage Creation, Community Organization Strengthening

Approach & Methodology: Participatory Needs Assessment, Lean Production Setup, Cooperative Development Models

Key Stakeholders: Local Farmers, Agri-Input Suppliers, Poultry Associations, DS Office

Duration: 2025 – Ongoing

Key Challenges: Lack of local feed production, Limited technical skills, Weak market access for smallholders

  • Established local feed manufacturing unit
  • Strengthened farmer cooperative
  • Enhanced income for 50+ small-scale poultry farmers

Integrated Dairy Cattle Farm (SME Support)

Sector: Dairy & Livestock Development

Services Provided: Land Acquisition & Farm Setup, Fodder Cultivation Planning, Cattle Rearing & Breeding Program, Farmer Training & Tech Integration

Approach & Methodology: Integrated Farming System Design, Climate-Resilient Agriculture Practices, Value Chain Development

Key Stakeholders: Dairy Development Board, Veterinary Services, Local Farmers, Private Sector Partners

Duration: Oct 2023 – Dec 2025

Key Challenges: Low milk yield and poor fodder availability, High cost of hybrid cattle, Need for technical know-how

  • 20-acre operational dairy farm
  • Annual fodder production: 2.5M kg
  • Milk yield: 10,500+ liters/year
  • 40+ hybrid cattle introduced to local farmers

Have a Project in Mind? Let's Build Together.

Whether you're planning a construction project, need specialized subcontracting support, or want to develop community-focused initiatives, our team brings expertise, accountability, and a passion for sustainable results.

We welcome partnerships, subcontracting opportunities, and turnkey project collaborations across Sri Lanka and internationally.

Contact Us